Abstract
Photograph of construction activities, including clearing of underbrush using controlled fires and bulldozers, in preparation for the damming of the Little Tennessee River.
Files
Thumbnail | File name | Date Uploaded | Visibility | File size | Options |
---|---|---|---|---|---|
Bulldozing_3corrected.jpg | 7 Sep 2022 | Public | 3.59 MB | ||
0-Bulldozing_3.jpg | 7 Sep 2022 | Public | 1.16 MB |
Metadata
- Subject
Environmental Law
- Date submitted
7 September 2022
- Keywords
- Additional information
Scanned from a faded original. Color-correction performed using Adobe Photoshop CS4. The original file is available from the link below.