Abstract
Photograph of construction crews preparing for the damming of the Little Tennessee River. Smoke in image is likely due to the use of controlled burning to clear underbrush.
Files
Thumbnail | File name | Date Uploaded | Visibility | File size | Options |
---|---|---|---|---|---|
dia_0043corrected.jpg | 7 Sep 2022 | Public | 3.3 MB | ||
0-dia_0043.jpg | 7 Sep 2022 | Public | 1.49 MB |
Metadata
- Subject
Environmental Law
- Date submitted
7 September 2022
- Keywords
- Additional information
Scanned from a faded original. Color-correction performed using Adobe Photoshop CS4. The original file is available from the link below.